Projects we have undertaken include:
- Feasibility Study For Bandar Sunway ‘Bus Rapid Transit’
- High Speed Rail Feasibility Study – Phase 1B Project
- Feasibility Study for the Proposed Light Rail Transit Line 3 (LRT3)
- The Independent Consultant to Review the Feasibility Study for MRT Line 2 Undertaken by SPAD
- The Southern Corridor High Speed Rail – Phase 2A Project: Civil & Engineering Consultant Services